{"id":1230,"date":"2026-07-28T22:19:21","date_gmt":"2026-07-28T19:19:21","guid":{"rendered":"https:\/\/www.imerekyapi.com\/taahhut-sozlesmesinde-bulunmasi-gereken-maddeler\/"},"modified":"2026-10-31T16:18:25","modified_gmt":"2026-10-31T13:18:25","slug":"clauses-that-must-be-included-in-a-commitment-agreement","status":"publish","type":"post","link":"https:\/\/www.imerekyapi.com\/en\/taahhut-sozlesmesinde-bulunmasi-gereken-maddeler\/","title":{"rendered":"Clauses That Must Be Included in a Contract for Services"},"content":{"rendered":"<p class=\"wp-block-paragraph\">Signed before construction of a villa begins <strong>contract of commitment<\/strong>, s\u00fcrecin en az proje kadar \u00f6nemli bir par\u00e7as\u0131d\u0131r. S\u00f6zle\u015fmede eksik veya belirsiz b\u0131rak\u0131lan bir madde, in\u015faat ilerledik\u00e7e ev sahibi ile y\u00fcklenici aras\u0131nda anla\u015fmazl\u0131\u011fa d\u00f6n\u00fc\u015febilir. \u0130merek Yap\u0131 olarak \u00c7e\u015fme ve Ala\u00e7at\u0131&#8217;da tamamlad\u0131\u011f\u0131m\u0131z villa projelerinde, s\u00f6zle\u015fmeyi imzadan \u00f6nce netle\u015ftirdi\u011fimiz birka\u00e7 temel ba\u015fl\u0131k var. A\u015fa\u011f\u0131da taahh\u00fct s\u00f6zle\u015fmesinde bulunmas\u0131 gereken 5 temel maddeyi s\u0131ralad\u0131k.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"2560\" height=\"1815\" src=\"https:\/\/www.imerekyapi.com\/wp-content\/uploads\/2026\/09\/taahhut-sozlesmesi-imza-sureci-scaled.jpg\" alt=\"Taahh\u00fct s\u00f6zle\u015fmesi imza s\u00fcreci: in\u015faat s\u00f6zle\u015fmesinin incelenmesi\" class=\"wp-image-1586\" srcset=\"https:\/\/www.imerekyapi.com\/wp-content\/uploads\/2026\/09\/taahhut-sozlesmesi-imza-sureci-scaled.jpg 2560w, https:\/\/www.imerekyapi.com\/wp-content\/uploads\/2026\/09\/taahhut-sozlesmesi-imza-sureci-300x213.jpg 300w, https:\/\/www.imerekyapi.com\/wp-content\/uploads\/2026\/09\/taahhut-sozlesmesi-imza-sureci-1024x726.jpg 1024w, https:\/\/www.imerekyapi.com\/wp-content\/uploads\/2026\/09\/taahhut-sozlesmesi-imza-sureci-768x545.jpg 768w, https:\/\/www.imerekyapi.com\/wp-content\/uploads\/2026\/09\/taahhut-sozlesmesi-imza-sureci-1536x1089.jpg 1536w, https:\/\/www.imerekyapi.com\/wp-content\/uploads\/2026\/09\/taahhut-sozlesmesi-imza-sureci-2048x1452.jpg 2048w, https:\/\/www.imerekyapi.com\/wp-content\/uploads\/2026\/09\/taahhut-sozlesmesi-imza-sureci-18x12.jpg 18w\" sizes=\"auto, (max-width: 2560px) 100vw, 2560px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">1. The Scope of the Work Must Be Clearly Defined<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">It is not enough to simply state \u201cvilla construction\u201d in the contract. Whether it refers to rough construction or includes finish work, and whether special features such as a pool or a Turkish bath are covered\u2014specifying these details item by item prevents disputes later on about whether a particular task was included in the scope of the work.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">2. Material and Brand Selection<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Specifying the brand\u2014or at least the quality class\u2014of the materials to be used, ranging from ceramics to fixtures and from insulation materials to exterior cladding, helps minimize discrepancies in expectations during the delivery phase.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">3. Delivery Schedule and Delay Provisions<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Net bir ba\u015flang\u0131\u00e7 ve teslim tarihi, s\u00f6zle\u015fmenin bel kemi\u011fidir. Olas\u0131 gecikme durumlar\u0131nda hangi taraf\u0131n nas\u0131l sorumlu tutulaca\u011f\u0131 da (hava ko\u015fullar\u0131, m\u00fccbir sebepler gibi istisnalar dahil) ba\u015ftan tan\u0131mlanmal\u0131d\u0131r. Cezai \u015fart\u0131n nas\u0131l kurgulanaca\u011f\u0131n\u0131 <a href=\"https:\/\/www.imerekyapi.com\/en\/insaatta-gecikme-cezasi-ceza-sarti\/\">in\u015faatta gecikme cezas\u0131<\/a> yaz\u0131m\u0131zda anlatt\u0131k; eser s\u00f6zle\u015fmesine ili\u015fkin temel kurallar <a href=\"https:\/\/www.mevzuat.gov.tr\/mevzuatmetin\/1.5.6098.pdf\" target=\"_blank\" rel=\"noopener nofollow\">6098 say\u0131l\u0131 T\u00fcrk Bor\u00e7lar Kanunu<\/a>&#8216;nda d\u00fczenlenmi\u015ftir.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">4. Payment Plan<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">\u00d6demelerin i\u015f ilerlemesine ba\u011fl\u0131 hakedi\u015f sistemiyle mi, yoksa a\u015fama bazl\u0131 sabit \u00f6demelerle mi yap\u0131laca\u011f\u0131 net olmal\u0131d\u0131r. Bu, hem ev sahibinin hem y\u00fcklenicinin nakit ak\u0131\u015f\u0131n\u0131 \u00f6ng\u00f6r\u00fclebilir k\u0131lar. Detaylar i\u00e7in <a href=\"https:\/\/www.imerekyapi.com\/en\/guide-to-the-payroll-system-and-payment-schedule\/\">hakedi\u015f sistemi<\/a> ve maliyet art\u0131\u015flar\u0131na kar\u015f\u0131 <a href=\"https:\/\/www.imerekyapi.com\/en\/price-adjustment-clause-in-a-construction-contract\/\">fiyat fark\u0131 (eskalasyon) maddesi<\/a> yaz\u0131lar\u0131m\u0131za bakabilirsiniz.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">5. Warranty and Post-Warranty Liability<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The contract should also specify which construction items are covered by the warranty after delivery and for how long (for example, waterproofing or roofing work). This is the most commonly omitted section in contracts: the warranty is discussed verbally, but its duration and scope are not put in writing. In the absence of a written definition, the parties\u2019 interpretations may diverge when an issue arises years after delivery. Specifying each item in writing protects both the homeowner and the contractor.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">\u0130merek Yap\u0131 ile \u015eeffaf Taahh\u00fct S\u00f6zle\u015fmesi S\u00fcreci<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/www.imerekyapi.com\/en\/contracting-services\/\">Our Contracting Services<\/a> As part of this process, we clarify all of the above points with our clients during the contract phase. This transparency ensures that there are no surprises in the later stages of the project.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">If you would like more information about the construction contract and the process for your villa project, please contact the \u0130merek Yap\u0131 team: +90 545 732 64 44 \/ bilgi@imerekyapi.com<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><em>This article is for general informational purposes only and does not constitute legal advice. The terms of the contract may vary depending on the project, the parties involved, and applicable laws; it is recommended that you consult with a legal advisor before signing.<\/em><\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Frequently Asked Questions<\/h2>\n\n\n<div id=\"rank-math-faq\" class=\"rank-math-block\">\n<div class=\"rank-math-list\">\n<div id=\"faqquestion-1753700000013\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question\">What is the most commonly overlooked clause in a contract?<\/h3>\n<div class=\"rank-math-answer\">\n\n<p>The most common shortcoming is the failure to clearly define the scope of work; the specific items of work covered by the contract must be listed item by item.<\/p>\n\n<\/div>\n<\/div>\n<div id=\"faqquestion-1753700000014\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question\">How should the payment plan be specified in the contract?<\/h3>\n<div class=\"rank-math-answer\">\n\n<p>It must be clearly defined whether payments will be made through a progress-based payment system or through fixed payments based on project phases.<\/p>\n\n<\/div>\n<\/div>\n<div id=\"faqquestion-1753700000015\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question\">What should the post-delivery warranty cover?<\/h3>\n<div class=\"rank-math-answer\">\n\n<p>The post-delivery warranty period for critical construction components, such as waterproofing and roofing work, must be specifically stated in the contract.<\/p>\n\n<\/div>\n<\/div>\n<div id=\"faqquestion-1753700000016\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question\">Should the brands of materials be specified in the contract?<\/h3>\n<div class=\"rank-math-answer\">\n\n<p>Yes. Specifying the brand or quality grade of the materials to be used helps prevent discrepancies in expectations during the delivery phase.<\/p>\n\n<\/div>\n<\/div>\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>What clauses must be included in a construction contract? From scope, the delivery schedule, and the payment plan to \u0130merek Yap\u0131\u2019s approach to contracts.<\/p>","protected":false},"author":2,"featured_media":1586,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[118],"tags":[],"class_list":["post-1230","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-taahhut-hizmetleri"],"_links":{"self":[{"href":"https:\/\/www.imerekyapi.com\/en\/wp-json\/wp\/v2\/posts\/1230","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.imerekyapi.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.imerekyapi.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.imerekyapi.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.imerekyapi.com\/en\/wp-json\/wp\/v2\/comments?post=1230"}],"version-history":[{"count":8,"href":"https:\/\/www.imerekyapi.com\/en\/wp-json\/wp\/v2\/posts\/1230\/revisions"}],"predecessor-version":[{"id":1989,"href":"https:\/\/www.imerekyapi.com\/en\/wp-json\/wp\/v2\/posts\/1230\/revisions\/1989"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.imerekyapi.com\/en\/wp-json\/wp\/v2\/media\/1586"}],"wp:attachment":[{"href":"https:\/\/www.imerekyapi.com\/en\/wp-json\/wp\/v2\/media?parent=1230"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.imerekyapi.com\/en\/wp-json\/wp\/v2\/categories?post=1230"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.imerekyapi.com\/en\/wp-json\/wp\/v2\/tags?post=1230"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}