Clauses That Must Be Included in a Contract for Services

When signing the engagement agreement, the client and the consultant

Signed before construction of a villa begins contract of commitment, sürecin en az proje kadar önemli bir parçasıdır. Sözleşmede eksik veya belirsiz bırakılan bir madde, inşaat ilerledikçe ev sahibi ile yüklenici arasında anlaşmazlığa dönüşebilir. İmerek Yapı olarak Çeşme ve Alaçatı’da tamamladığımız villa projelerinde, sözleşmeyi imzadan önce netleştirdiğimiz birkaç temel başlık var. Aşağıda taahhüt sözleşmesinde bulunması gereken 5 temel maddeyi sıraladık.

Taahhüt sözleşmesi imza süreci: inşaat sözleşmesinin incelenmesi

1. The Scope of the Work Must Be Clearly Defined

It is not enough to simply state “villa construction” in the contract. Whether it refers to rough construction or includes finish work, and whether special features such as a pool or a Turkish bath are covered—specifying these details item by item prevents disputes later on about whether a particular task was included in the scope of the work.

2. Material and Brand Selection

Specifying the brand—or at least the quality class—of the materials to be used, ranging from ceramics to fixtures and from insulation materials to exterior cladding, helps minimize discrepancies in expectations during the delivery phase.

3. Delivery Schedule and Delay Provisions

Net bir başlangıç ve teslim tarihi, sözleşmenin bel kemiğidir. Olası gecikme durumlarında hangi tarafın nasıl sorumlu tutulacağı da (hava koşulları, mücbir sebepler gibi istisnalar dahil) baştan tanımlanmalıdır. Cezai şartın nasıl kurgulanacağını inşaatta gecikme cezası yazımızda anlattık; eser sözleşmesine ilişkin temel kurallar 6098 sayılı Türk Borçlar Kanunu‘nda düzenlenmiştir.

4. Payment Plan

Ödemelerin iş ilerlemesine bağlı hakediş sistemiyle mi, yoksa aşama bazlı sabit ödemelerle mi yapılacağı net olmalıdır. Bu, hem ev sahibinin hem yüklenicinin nakit akışını öngörülebilir kılar. Detaylar için hakediş sistemi ve maliyet artışlarına karşı fiyat farkı (eskalasyon) maddesi yazılarımıza bakabilirsiniz.

5. Warranty and Post-Warranty Liability

The contract should also specify which construction items are covered by the warranty after delivery and for how long (for example, waterproofing or roofing work). This is the most commonly omitted section in contracts: the warranty is discussed verbally, but its duration and scope are not put in writing. In the absence of a written definition, the parties’ interpretations may diverge when an issue arises years after delivery. Specifying each item in writing protects both the homeowner and the contractor.

İmerek Yapı ile Şeffaf Taahhüt Sözleşmesi Süreci

Our Contracting Services As part of this process, we clarify all of the above points with our clients during the contract phase. This transparency ensures that there are no surprises in the later stages of the project.

If you would like more information about the construction contract and the process for your villa project, please contact the İmerek Yapı team: +90 545 732 64 44 / [email protected]

This article is for general informational purposes only and does not constitute legal advice. The terms of the contract may vary depending on the project, the parties involved, and applicable laws; it is recommended that you consult with a legal advisor before signing.

Frequently Asked Questions

What is the most commonly overlooked clause in a contract?

The most common shortcoming is the failure to clearly define the scope of work; the specific items of work covered by the contract must be listed item by item.

How should the payment plan be specified in the contract?

It must be clearly defined whether payments will be made through a progress-based payment system or through fixed payments based on project phases.

What should the post-delivery warranty cover?

The post-delivery warranty period for critical construction components, such as waterproofing and roofing work, must be specifically stated in the contract.

Should the brands of materials be specified in the contract?

Yes. Specifying the brand or quality grade of the materials to be used helps prevent discrepancies in expectations during the delivery phase.